Cooprogetti / Area: Infrastructures
Infrastructures

New bridge over the Sile river

Riqualification of the A4 highway: bridge over the Sile river

Sector: Rails, roads and bridges.
Description: A4 highway Venezia - Trieste. Extension of the highway with the creation of a third lane. Lot Quarto d’Altino San Donà di Piave from Km 10 + 950,00 to Km 29 + 500,00.
Location: San Donà di Piave (VE) Italy
Client: Autovie Venete S.p.a.
Year: 2007 - 2009
Project value: 118.000.000 euro
Services: Structural preliminary and final design.